Amalachaur Multiple Stage Lifting Water Supply Project

Lifting Water Supply Project

Project Features:

Population : 6461

Type : Semi Urban

Total Project Cost : 290,889,987.71

Water Retaining Structures :  

Intake = Infintration gallery/Sump well (12lps)

RCC Ground Reservoir Tank = 7 Nos.

Break Pressure Tank = 14 Nos.

No of Stage of Lifting = 5

Water Treatment Structures:

Plain Sedimentation Tank (12lps – 1 Nos), Slow sand Filter (12 lps – 1 Nos), Chlorination Units – 5 Nos

Transmission and Distribution Pipeline:

Transmission = 7.81 KM

Distribution = 56.22 KM

Electromechanical Components:

Pumps ( 7.5HP -1, 41 HP – 1, 60 HP -1, 70HP-1 Nos.)

Transformers (25 KVA -1, 50KVA -2 & 100 KVA-2 Nos.) 


Roles and Responsibilities:

Field Survey, Network Design, Analysis using EPANET, Engineering Drawing, Cost Estimate Works and assistance in Financial Analysis of the project.


                             